The problem
Rain left the west slope the same afternoon it fell.
Ashe juniper came off in lanes, not as a clear-cut. Little bluestem and sideoats went onto the caliche the first fall, and again the next. The live oaks stayed. Two cisterns take the barn roof. Drip runs two seasons, then a monthly soak on the young trees only.

The site
11 acres in Driftwood.
| Soil | Brackett and Tarrant. Shallow, with caliche at the surface. |
|---|---|
| Slope | Eight to fifteen percent, falling west into the draw. |
| Water | No dependable well. Two 5,000-gallon cisterns. Drip through year two. |
| Started | 2021 |
The plan
Drawn for year ten.
A diagram, not the survey. North is up. The bar is 40 feet.
- Barn and houseKept. The roof is the water source.
- MeadowSeeded the falls of year 0 and year 1.
- Live oaksAlready on the ridge. Fenced through year 1.
- Dry drawLeft as a draw. Cover is the work.
- CisternsTwo, 5,000 gallons each, at the barn.
- PathGravel, to the overlook. No concrete.
The same ground
Year 0, year 3, year 10.



Plant list
What we actually specified.
Eighty percent of the list, by count, is native to the Edwards Plateau. The deer fence stays through the first spring.
- Little bluestemSchizachyrium scopariumLow after year one
- Sideoats gramaBouteloua curtipendulaLow after year one
- Lindheimer muhlyMuhlenbergia lindheimeriLow
- Mealy blue sageSalvia farinaceaLow
- Four-nerve daisyTetraneuris scaposaLow
- Flame acanthusAnisacanthus quadrifidusLow
- Plateau live oakQuercus fusiformisDeep, infrequent. The existing trees.
The work
Scope, money, and the years.
| Scope | Juniper lanes, meadow seeding, oak protection, two cisterns, and a gravel path to the draw. |
|---|---|
| Budget | $180,000–$240,000 built, master plan $18,000. |
| Duration | Plan in five weeks, spring 2021. Planted fall 2021 and fall 2022. Stewardship through 2031. |
From the owner
August of year three, the draw still had cover. We never ran a hose to it.