From the walk to year ten.

What you decide, what you receive, and when we plant. The walk is within ten days. The master plan takes four to six weeks.

Site walk and soil tests

Ten days.

We walk the acres you actually own, not the listing. Caliche, slope, cedar, deer sign, and where the water already goes in a storm.

DurationWalk within 10 days. Soil notes back in about 2 weeks.
You decideWhich acres are in the first phase, and what stays: oaks, the tank, the drive.
You receiveA marked walk sheet and a short list of what the ground will not do.

Master plan

Four to six weeks.

The drawing. Court, water, meadow, and the year-ten line, so a later season still fits.

Duration4–6 weeks after the soil tests.
You decideWhere the court, the water, and the meadow sit.
You receiveThe plan, the plant list, and a fee of $14,000–$40,000. One revision is in that fee.
Limestone house and metal roof under oaks, seen across a dry yard from the fence.
Limestone, metal roof, oaks. The walk starts at the fence, not at the porch.

Phasing and pricing

Two to three weeks.

The plan split into seasons you can pay for. Partner lenders exist for the larger builds. No lender is named, and we take no fee for an introduction.

Duration2–3 weeks after you accept the plan.
You decideWhich season is first, and the budget band.
You receiveA phased budget. Built work is usually $90,000–$650,000 over one to three seasons.

Build

Plant in fall.

Hardscape in the dry months. Seed and plants after the heat breaks, October into November, unless a burn ban stops the week.

DurationOne to three seasons.
You decideSubstitutions if a stone or a plant is short that month.
You receiveTerraces, the court, establishment drip, and the planting. Not a lawn.

Stewardship

Years one through ten.

The calendar you can hand to whoever is on the place when you are not. Two visits a year through year two, then the written years.

DurationYears 1–10. Visits through year two.
You decideWhen the deer fence comes down. Usually the spring of year two.
You receiveThe calendar, the visits, and replacement of failed plants through year two.

Year 5

Live oaks shade the west wall.

Watering is down to once a month. The meadow has closed between the walls.

West of Austin, two to twenty acres.

Dripping Springs, Wimberley, Spicewood, Driftwood, Johnson City, Fredericksburg.

Built work usually lands between $90,000 and $650,000, phased over one to three seasons. We plant in fall, when the heat has broken and the roots have a chance before August.

Phased budgets, and partner lenders for larger builds. No lender is named, and we take no fee for an introduction. The master plan is the first piece, from $14,000 to $40,000, and the phases are drawn against it.

From the properties

From the properties

The walk took a morning. They marked what the flash flood does and we stopped arguing about the low corner.

PaulWimberley

Phasing meant we could build the terraces one dry season and plant the next fall, without redrawing the hill.

LenaSpicewood

Year two they replaced three cedar elms and took the fence down in April. The calendar said April.

ChrisDripping Springs